Athlon Solutions -
Limestone Lay Down Area

August 2020
Geismar, LA
Industrial Services

The project called for de-grassing a 37,000 square foot area followed by the excavation of 6” of material over the entire area to create an accurate finished grade. Once the excavation was completed, we placed 8” of compacted limestone over the area and graded it for positive drainage. When finished, Athlon was able to park empty tankers and non-hazardous chemical totes on the limestone with no worry of sinking, and it opened their concrete area considerably to allow for more truck traffic since they are pushing out more products.