2021 National Hurricane Conference

From June 14-17, several members of the Vantage team attended the 2021 National Hurricane Conference in New Orleans, Louisiana.

The annual conference’s goal is to improve hurricane preparedness, response, recovery and mitigation throughout the United States and the tropical islands of the Caribbean and Pacific. The conference also serves as a forum for the exchange of new ideas on improving federal, state, and local Emergency Management policy.

Our team had a wonderful time learning and training. We are excited to head home and apply the information we learned in order to better help and serve our community.

View our hurricane preparedness tips here https://vantage-contractors.com/hurricane-season-we-want-you-to-be-prepared/ and read more about the conference here https://hurricanemeeting.com/  

VANTAGE Sponsors Municipal Day Crawfish Boil

We are proud to have sponsored the 44th Municipal Day Crawfish Boil hosted by the Louisiana Municipal Association. The food was great and the people were even better!

The LMA is a statewide member organization that advocates for all 303 municipalities and 2 parishes, to strengthen community development because we all call a village, town, or city “home”. To learn more about the Louisiana Municipal Association, visit https://www.lma.org/.

Pipeline Right of Way Clearing

Pipeline Right of Way Clearing

Year-Round
Industrial Services

Right-of-way (ROW) vegetation clearing is a crucial aspect of line maintenance that enables increased visibility and access to the pipeline. Such clearing may also enhance the integrity of the pipe itself, as harmful growth is kept off the top of the line. Vantage specializes in pipeline clearing, and services many clients throughout the year.

Belle Chasse Shooting Range Land Clearing

Belle Chasse Shooting Range Land Clearing

January 2021
Belle Chasse, LA
Industrial Services

Vantage Industrial Services was contracted to clear this land at a shooting range in Belle Chasse, LA.  With our specialization in right-of-way maintenance and our extensive equipment fleet, we were able to revitalize this shooting range so that it could once again be utilized.

Athlon Solutions – Limestone Lay Down Area

Athlon Solutions -
Limestone Lay Down Area

August 2020
Geismar, LA
Industrial Services

The project called for de-grassing a 37,000 square foot area followed by the excavation of 6” of material over the entire area to create an accurate finished grade. Once the excavation was completed, we placed 8” of compacted limestone over the area and graded it for positive drainage. When finished, Athlon was able to park empty tankers and non-hazardous chemical totes on the limestone with no worry of sinking, and it opened their concrete area considerably to allow for more truck traffic since they are pushing out more products.